After installation and leak test it is necessary not later than within 24 hours after
fi
lling of water and emptying the bathtub
to clean it and protect it from damage during the construction phase. If the above condition is not followed, the warranty
is not valid.
04 Bathtub
apron
After a test run
fi
nish encasing the bathtub. Between the bathtub edge and the casing allow for a gap 3-4 mm wide
for silicon seal (consider the producer’s tips regarding the usage of the product!).
While encasing the bathtub it is necessary to consider the following points:
1.
All systems of conduits and components of the system initially installed in the bathtub and the ones installed
at the factory must rest freely behind the walling.
2.
The displayed system components,
fi
rst of all the fan side of the pump, should be protected against dirt
by covering them.
3.
Mount the apron in such a way that the system components are protected against touching and water splashing.
The bathtub’s operation without the apron is not allowed, except for the test run.
4.
In case of all models, place easily accessible and easily opening inspection windows
min. 400 to 450 mm wide and 350 mm high, according to annexed drawings with dimensions.
Moreover, allow for an inspection window near the outlet.
The inspection window can be opened only with the use of proper tools. The given dimensions should be
absolutely maintained, because in case of a need for maintenance only then it is possible to easily disassemble
the system components. An ideal solution is placing the „air and inspection grate” produced by Hoesch,
dimensions 420 x 325 mm (article No. 6683.---).
5.
On account of the rotating jets and the blower a free inlet of air should be provided (approx. Vo = 60,0 m³/h with
the max. number of revolutions of the blower), because when the casing is hermetically tight there is no inlet
of air to the rotating jets and to the blower. A hole with the dimensions 100 x 100 mm in the casing is suf
fi
cient.
The use of the „air and inspection grate” will provide suf
fi
cient in
fl
ow of air.
05 Diagram
1 The steering connection to the mains 230V~,
50/60 Hz, 10 A connection box self- provided
2 Control panel
3 Controller
4 Blower
5 Sewerage system terminal Ø 40/50
6 Pump
7 Back jet (optional equipment)
8 LED-white
9 Feet jet (optional equipment)
10 Inspection opening
11 Hydromassage jet
12 Bottom nozzle