24
5-3
5-4
5-5
1
I
O
Operation
5.1 Preparation
•
The operator should be familiar with the warnings
and cautions.
•
The operator should be qualifi ed to work with the unit.
•
Always ensure that the wheel guard (when
applicable) is lifted and the gauge arm is in its home
position (far left position) when the unit has been
switched off.
5.1.1 Power up
•
Do not keep any key pressed down during power
up.
Refer to
Figure 5-3
.
•
Insert the power cable plug in the mains socket.
•
Set the switch on the socket to the “
I
” position.
Note
:
If the unit beeps and does not proceed or if
an error code is shown, refer to Chapter 7.
The unit will beep and perform a self-test now
.
The display and the weight position indicators relating
to the current weight mode will stay on (default).
Refer to
Figure 5-4
for an example.
The unit is now ready to receive input.
5.2 Immediate stop
Refer to
Figure 5-5
.
To perform an immediate stop:
•
Select the STOP key to apply the electronic brake.
•
Apply the foot brake to stop the wheel.
When an immediate stop occurs, due to an unexpected
action of the unit, rethink about the steps made:
Did the operator make an error or omit to do
something?
•
Correct the input and continue working.
Did the unit do something unexpected?
•
Read the relevant chapters again.
•
Prepare the unit for a restart:
switch off the unit
switch on the unit again.
•
Carefully repeat the commands with the manual
available.
•
If the unit does not function correctly, call the service
team immediately and:
PREVENT ANY FURTHER USE OF THE UNIT.
..
..
..
.
.
Summary of Contents for geodyna 7100
Page 94: ...94 Blank Page ...