66
Section 3 - Operation
14. Make sure all lubrication points and vacuum blower
motor bearings are greased with the specified
lubricants.
15. Check all controls, switches and lights for proper
operation.
16. Make sure the Mobile Spare Parts and Tool Sys-
tems are complete and onboard.
17.
Conduct a final walk around and visually check all
components. Look for obvious problems that may
have been overlooked.
3.3 Filling The Clean Water Tank
The clean water fill connection on the left side of
the skid is a quick connect fitting that accommo
-
dates large hoses that are typically connected to a
metered source like a fire hydrant to expedite the
filling of the tank. Only use potable water (clean
enough to drink) to increase the service life of the
components in your Ultra-High Pressure system.
Filling the freshwater tank:
1.
If this is the first time using the water source, flush
for several minutes prior to filling the tank to help
ensure that no debris enters the system.
Clean Water Fill Fitting & Valve
Clean Water Tanks, Fill Valve & Sight Gauge
2.
Connect the fill hose to the water source and flush
hose for several seconds.
3.
Open the water tank fill valve and connect the hose
to the quick connect fill fitting. Secure the hose to
the fitting with the cam-lock levers.
Summary of Contents for SK5500
Page 2: ......
Page 80: ...80 NOTES...
Page 135: ...135 Section 5 Scheduled Maintenance Hog Technologies...
Page 141: ...141 Appendix 2 Tools Spare Parts...
Page 142: ...142 Appendix 2 Tools Spare Parts...
Page 143: ...143 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM...
Page 152: ...152 NOTES...
Page 159: ......
Page 160: ......