101
Section 4 - General Maintenance
8. Apply a light coat of anti-seize to the threads
on the new nozzles.
9. Install the nozzles into the spray bar being
careful not to get any anti-sieze on the seat
area of the nozzle or the spray bar.
10.
Tighten each nozzle finger tight, then torque
to 10 ft lbs.
11. Reactivate the truck and the waterblasting
system by following the steps in the Start Up
Procedure.
12. Set the Head Rotation speed dial to 0, then
turn the PTO switch on to activate the ultra
high pressure water system.
13. Make sure all personnel are well clear of the
blasting heads, then press the DUMP VALVE
40K switch to activate the high pressure sys-
tem and set the operating pressure to a safe
level. Staying well clear of the water jets, no
closer than 18”, visually inspect the spray pat-
tern of each nozzle.
14.
Confirm at least a 1 inch, needle tight, water
jet is coming from each nozzle.
15. Deactivate the waterblasting system and shut-
down the truck.
16. Replace the spray bar protective cover and
gasket.
Nozzle Pressure Test - All Nozzles Good
Typical Spray Bar & Nozzle
Summary of Contents for STRIPE SH7500
Page 1: ...75 H Operations Manual...
Page 2: ......
Page 72: ...72 NOTES...
Page 108: ...108 NOTES...
Page 161: ...161 Section 5 Scheduled Maintenance...
Page 167: ...167 Appendix 2 Tools Spare Parts...
Page 168: ...168 Appendix 2 Tools Spare Parts...
Page 169: ...169 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 60...
Page 178: ...178 NOTES...
Page 185: ......
Page 186: ......