110
Section 5 - Scheduled Maintenance
5.3 Periodic Maintenance Items
The primary components in the water blasting sys-
tem have specific stated service intervals. Other
components that support primary equipment re-
quire periodic inspection and routine maintenance.
Many of those items are mentioned in this section.
Tool Box Door Hinges And Latches.
Monthly/200 Hours:
• Lubricate and inspect all hinges.
• Inspect and lubricate latches. Replace dam
-
aged or worn out latches immediately.
Ladders And Inspection Panels
Monthly/200 Hours:
• Lubricate and inspect all hinges.
• Inspect and lubricate safety pins and latches.
Replace damaged or worn out safety pins
immediately if the spring becomes weak or
damaged.
Safety Pins
Weekly/50 Hours:
•
Lubricate the retaining ball or sliding shaft on
safety pins.
•
Inspect and test for proper operation. Replace
damaged, corroded or worn out pins imme-
diately.
Hog Arm Transport Lock Lever
Weekly/50 Hours:
•
Lubricate hinge and detent ball.
•
Inspect and test for proper operation. Repair
if damaged or worn immediately.
Ball Valves
Monthly/200 Hours:
•
Open and close ball valves at least once each
month to keep them free and operating prop-
erly.
•
Lubricate and inspect valve shafts and han-
dles. Replace if badly corroded.
Charge Water Pump And Hoses
Weekly/50 Hours:
•
Inspect the charge water pump, hoses and
fittings for leaks and signs of wear or deterio
-
ration. Any questionable or leaking component
should be repaired or replaced before operat-
ing the system.
•
Run the pump and listen for unusual noises
and proper operation. Find and correct the
cause of unusual noises or erratic operation.
Bilge Pump And Automatic Switch
Weekly/50 Hours:
• Supply water to the high pressure pump stuff
-
ing box sump and monitor the operation of the
bilge automatic switch, bilge pump and drain
system. Correct any problems found.
Monthly/200 Hours:
•
Remove the lid on the automatic switch sump
and clean out accumulated debris that could
interfere with the switch operation or water
flow to the pump.
•
Test the switch for proper operation.
Debris Tank Transfer Pump And Automatic
Switch
Weekly/50 Hours:
•
Remove and clean the debris pump strainer
screen. Test the pump for proper operation.
•
Fill the debris tank with water to a level slightly
above the automatic switch. Monitor the op-
eration of the automatic switch, transfer pump
and drain system. Correct any problems found.
Monthly/200 Hours:
• Thoroughly clean and flush the float for the
automatic switch with clean water. Make sure
the switch moves freely.
•
Test the switch for proper operation.
Blasting Head Thru-Shaft Motor
Weekly/50 Hours
• Adjust bearing pre-loads. (Refer to section
5.21 Thru-Shaft Motor Bearing Pre-Load)
Summary of Contents for STRIPE SH7500
Page 1: ...75 H Operations Manual...
Page 2: ......
Page 72: ...72 NOTES...
Page 108: ...108 NOTES...
Page 161: ...161 Section 5 Scheduled Maintenance...
Page 167: ...167 Appendix 2 Tools Spare Parts...
Page 168: ...168 Appendix 2 Tools Spare Parts...
Page 169: ...169 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 60...
Page 178: ...178 NOTES...
Page 185: ......
Page 186: ......