145
Section 5 - Scheduled Maintenance
Reactivating a truck winterized with antifreeze:
Note that the steps in this procedure are intended
to recover as much of the antifreeze from the
system as possible.
1. Add clean fresh water to the clean water tank.
2. Activate the truck and waterblasting system
following the steps in the Startup Procedure.
3. Position the blasting head over a container to
collect the antifreeze.
4. With the engine at idle, activate the DUMP
VALVE 40K switch and allow clean water to
flow and push all the antifreeze out the blast
-
ing head into a container.
5.
Once the water flows clear, turn off the CHARGE
PUMP switch, then turn the PTO switch off.
6. Shutdown the waterblasting system and return
the truck to the service position.
7. Install spray bar
8. At this point you’re ready to continue with
complete startup procedure. (Refer to the
System Startup Procedure in Section 3)
NOTICE:
IF YOU ARE INTENDING TO REUSE THE RECOVERED
ANTIFREEZE, MAKE SURE TO TEST IT AND MAKE SURE THE
ANTIFREEZE MIXTURE HAS NOT BECOME DILUTED TO THE
POINT WHERE IT WILL NOT PROTECT THE WATER SYSTEM
AT THE EXPECTED TEMPERATURES.
REMEMBER THAT THE ANTIFREEZE WILL BE SLIGHTLY
DILUTED EACH TIME THE SYSTEM IS WINTERIZED, WHICH
WILL CAUSE THE FREEZE PROTECTION TEMPERATURE TO
RISE. THE AMOUNT OF DILUTION WILL VARY, DEPENDING
ON THE VOLUME OF FRESHWATER IN THE SYSTEM AT THE
TIME OF WINTERIZATION.
CAUTION
TO AV O I D S E R I O U S D A M A G E TO WAT E R B L A S T I N G
HYDRAULIC COMPONENTS WHEN OPERATING IN FREEZING
TEMPERATURES OR TEMPERATURES BELOW 60 DEGREES
FAHRENHEIT (16
0
CELSIUS), IT IS NECESSARY TO OPERATE
THE HYDRAULIC SYSTEM AND OTHER WATER BLASTING
C O M P O N E N T S I N C L U D I N G T H E B L O W E R A N D H I G H
PRESSURE PUMP, WITH THE ENGINE AT IDLE, UNTIL THE
HYDRAULIC FLUID REACHES A TEMPERATURE OF 60
DEGREES FAHRENHEIT (16 DEGREES CELSIUS) OR ABOVE.
Summary of Contents for STRIPE SH7500
Page 1: ...75 H Operations Manual...
Page 2: ......
Page 72: ...72 NOTES...
Page 108: ...108 NOTES...
Page 161: ...161 Section 5 Scheduled Maintenance...
Page 167: ...167 Appendix 2 Tools Spare Parts...
Page 168: ...168 Appendix 2 Tools Spare Parts...
Page 169: ...169 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 60...
Page 178: ...178 NOTES...
Page 185: ......
Page 186: ......