147
Section 5 - Scheduled Maintenance
Tools and Materials Required
Tools
2 - Medium Sized Flat Blade Screwdrivers
1 - Medium Sized Channel Lock Pliers
1 - 3/4” (19mm) Open End Wrench
1 - 15/16” (24mm) Open End Wrench
1 - 15/16” (24mm) Box End Wrench
1 - 15/16” (24mm) Deep Well Socket
1 - 1 1/8” (28mm) Deep Well Socket
1 - 1/2” Drive Rachet Wrench
1 - 1/2” Drive Torque Wrench
1 - Spanner socket (weldment tool)
(Supplied in your Truck Tool Kit)
1 - 6 mm Allen Wrench
Supplies
•
Anti-Seize
•
Grease Gun and Multi-Purpose Grease
•
Rags or Paper Towels
•
9396K21 O-ring (Supplied in Spare Parts Kit)
Note:
Use anti-seize compound on bolt and thru-
shaft threads and threaded hose connections
to prevent galling.
WARNING
INJURIES FROM ULTRA-HIGH PRESSURE WATERBLASTING
IS VERY SERIOUS AND CAN RESULT IN A FATALITY. ALWAYS
MAKE SURE ALL PERSONNEL ARE A SAFE DISTANCE
FROM THE WORK AREA BEFORE THE PRESSURE PUMP
IS ENGAGED. NEVER PUT HANDS, FEET OR ANY PART OF
YOUR BODY IN OR NEAR THE HIGH PRESSURE STREAM.
Summary of Contents for STRIPE SH7500
Page 1: ...75 H Operations Manual...
Page 2: ......
Page 72: ...72 NOTES...
Page 108: ...108 NOTES...
Page 161: ...161 Section 5 Scheduled Maintenance...
Page 167: ...167 Appendix 2 Tools Spare Parts...
Page 168: ...168 Appendix 2 Tools Spare Parts...
Page 169: ...169 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 60...
Page 178: ...178 NOTES...
Page 185: ......
Page 186: ......