34
34
Section 2 - Stripe Hog Systems
NOTICE:
ALWAYS MAKE SURE TO CHECK THE HOG HEAD FOR
SMOOTH AND PROPER OPERATION BEFORE EACH SHIFT.
DO NOT USE EQUIPMENT THAT HAS NOT BEEN CHECKED
THOROUGHLY.
The spray bar is rotated by a special hydraulic
powered “thru-shaft” motor. The center of the ro-
tating shaft is drilled to allow high pressure water
to pass through the shaft to the spray bar. Spray
bar rotation is controlled by the HEAD ROTATION
speed dial on the control panel.
The Hog Head design allows the operator to choose
several different length spray bars for specific
removal widths. The operator can choose spray
bar rotation speeds between 700 and 3000 RPM.
The flexible design of the tubular head plate allows
the operator to configure the blasting head in a
variety of configurations to accommodate different
waterblasting operations. It is equipped with four
adjustable heavy duty castors wheels that support
the blasting head and prevent the spray bar and
shroud from touching the road surface. The castor
wheels are attached to heavy duty arms mounted
to the tubular head plate. The arms swivel to allow
the wheel location to be adjusted to avoid hazards
such as rumble strips and road reflectors or to ac
-
commodate other operating situations. The arms
are secured in position by adjustable friction plates
with a bolt and jam nut locking system. The arms
are adjusted by loosening the jam nut and moving
the arm to the desired position. Then tighten the
jam nut to secure the arm.
Tubular Head Plate Caster Wheels, Arms & T-Handle Pins
1.
Adjustable Friction Plate
5.
Castor Wheel Assembly Threaded Shaft
2.
Friction Plate Bolt & Jam Nut
6.
Castor Wheel Support Arm
3.
T-Handle Pin
7.
Castor Wheel Assembly
4.
Height Adjustment Rod
8.
Tubular Head Plate
7
3
4
6
5
1
2
8
Summary of Contents for STRIPE SH7500
Page 1: ...75 H Operations Manual...
Page 2: ......
Page 72: ...72 NOTES...
Page 108: ...108 NOTES...
Page 161: ...161 Section 5 Scheduled Maintenance...
Page 167: ...167 Appendix 2 Tools Spare Parts...
Page 168: ...168 Appendix 2 Tools Spare Parts...
Page 169: ...169 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 60...
Page 178: ...178 NOTES...
Page 185: ......
Page 186: ......