Section 2 - Stripe Hog Systems
2.10 Electrical System
Your truck can be equipped with either a 12 volt
or 24 volt DC electrical system depending on
your location and the chassis manufacturer. The
waterblasting electrical system is totally isolated
from the truck electrical system.
The waterblasting system is equipped with two
heavy duty main circuit breakers on the side of
the battery compartment on the driver’s side of
the chassis. The main circuit breakers protect
the waterblasting DC circuits and can function
as the main disconnect switch to deactivate the
waterblasting electrical system. Fuses in the cab
control panel protect accessory circuits activated
by the switches. Other in-line fuses and fuses in
the outside terminal/OTB box protect other elec-
trical equipment installed by Hog Technologies.
50 AMP Main Circuit Breakers
The 50 amp breakers are connected directly to
battery and supply electrical power directly to
the control panel and outside terminal/OTB box
accessory fuse panels. The breakers must be on
to power the waterblasting electrical system.
Each main circuit breaker is equipped with a yellow
indicator/reset lever that indicates the status of
the breaker (ON or OFF/TRIPPED) and is used to
reset the breaker if it trips or to turn the breaker
and electrical system off.
These are heavy duty circuit breakers that typi-
cally trip only when there is a fault in the system.
If a main breaker trips, you should find and cor
-
rect the problem before resetting the breaker.
The breaker is reset by moving the yellow lever
to the ON position.
Each main breaker can be used as a main discon-
nect switch by manually moving the yellow lever to
the OFF or ON position. Move the lever to the ON
position to activate the electrical system. Move
the yellow lever to OFF position to deactivate the
electrical system.
Typical 50 AMP Amp Main Fuses & In-Line Fuse
Typical Main Fuse Reset Lever
Summary of Contents for STRIPE SH7500
Page 1: ...75 H Operations Manual...
Page 2: ......
Page 72: ...72 NOTES...
Page 108: ...108 NOTES...
Page 161: ...161 Section 5 Scheduled Maintenance...
Page 167: ...167 Appendix 2 Tools Spare Parts...
Page 168: ...168 Appendix 2 Tools Spare Parts...
Page 169: ...169 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 60...
Page 178: ...178 NOTES...
Page 185: ......
Page 186: ......