Thank you for purchasing this quality product. Be sure to check all packing materials carefully for
small parts that may have come loose inside the carton during shipment.
***Caution: Please read all instructions carefully before starting the assembly process. These parts
are cumbersome and heavy. Therefore, two people are recommended in order to prevent personal
injury and insure the parts are not damaged during the assembly.
Step 1
Step 2
Code
Q'TY
a
1 PC
b
4 PCS
c
8 PCS
d
8 PCS
e
4 PCS
Flat Washer
∮
1/4"x
∮
18 x 2mm T
Allen Key 4*74*29mm
Bolt
∮
1/4"x 11.5 x 38mm
Assembly Instructions
2678-60H: King Sleigh Headboard
Hardware List
Spring Washer
∮
1/4"x
∮
11x 2mm T
Bolt
∮
1/4"x 11.5 x 50mm
Assemble leg frame &
Headboard panel by using bolts
"b" and washers.
Assemble the Headboard legs & the
stretcher by using bolts "e" and
washers.