IF FURTHER ASSISTANCE IS REQUIRED:
CONTACT STAR/HOLMAN FACTORY SERVICE TEAM AT 1-800-807-9054
1
UNCRATING AND INSPECTION
Unpack unit and components from container. Remove all visible packing material, inspect
unit for damage. If damage is discovered, file a claim immediately with the carrier that
handled the shipment.
The following should be included in the container:
•
1ea. baking oven with heaters, and conveyor belt in place.
(NOTE):
Remove heating element-shipping supports.
•
1ea. stainless steel unload tray, 1ea. stainless “Bake Aid” bracket
1ea. “Bake Aid” magnet label, 2ea. crumb trays & 4ea. metal legs.
ASSEMBLY AND INSTALLATION
1.
Attach legs by screwing into weld nuts.
2.
Anti Skid pads are available at no charge and may be adhered to the foot section of
each leg to prevent sliding. Call 1-800-807-9054 for details.
CAUTION:
The National Sanitation Foundation does not approve use of these pads.
3.
Install unit in its operating position. The load & unload ends must be at least 6" from
any vertical combustible surfaces. Allow sufficient space for operating personnel.
Have an electrician connect input power to the unit in accordance with local electrical
codes.
WARNING:
MAKE SURE ALL INPUT POWER IS OFF BEFORE
INSTALLING/REMOVING ANY PARTS.
WARNING:
BEFORE INSTALLING UNIT, HAVE YOUR ELECTRICIAN CHECK WITH
LOCAL POWER COMPANY TO DETERMINE ACTUAL VOLTAGE AT JOB SITE.
WARNING:
BE ABSOLUTELY SURE THE GROUND (EARTH) CONNECTION IS
PROPERLY WIRED. NEVER CONNECT UNIT TO POWER WITHOUT PROPER
GROUND CONNECTIONS. IMPROPER GROUND MAY RESULT IN SEVERE INJURY
OR FATALITY.
4. Before applying input power to the unit check heating elements for breakage. Do not
apply power to the unit if a broken tube is found. If no broken tubes are found apply
input power by switching the master On/Off toggle to the ON position. Turn conveyor
belt speed control to the maximum setting and check all heater tubes and conveyor for
proper operation.
ADJUSTABLE LEGS SCREW
INTO BOTTOM OF UNIT
Summary of Contents for qt14
Page 21: ......