background image

2/34

BODEN II 40

MAKE 

SURE

 THAT THE FOUNDATION 

IS INSTALLED ON A 

LEVEL

 SURFACE. 

CHECKING ALL DIRECTIONS, 

INCLUDING 

CORNER

 TO CORNER. 

 

1

%

LAY OUT THE 

FOUNDATION

 

BEAMS

 

AND 

SQUARE

 IT BY MEASURING 

FROM CORNER TO 

CORNER.

A

C

D

B

AB=CD

IFB2

IFB1

Summary of Contents for 4200002-1

Page 1: ... 120 45 6 20 700 80 50 4 40 5 70 6 160 4 50 6 140 1 4 40 M8 70 Ø 3 mm Ø 4 mm Ø 5 mm Ø 8 mm Ø 20 mm 1 34 BODEN II 40 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS ...

Page 2: ...MAKE SURE THAT THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 1 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER A C D B AB CD 0 IFB2 IFB1 ...

Page 3: ... 12 6 140 Ø 5 mm 3 34 BODEN II 40 ATTACH FOUNDATION BEAMS WITH SCREWS 2 ...

Page 4: ...0 4 34 BODEN II 40 LAY OUT THE BOTTOM LOGS ATTACH TO THE FOUNDATION THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS BY APPROXIMATELY 5MM THIS OVERHANG IS DESIGNED AS A RAIN DRIP 3 6 140 2 BL 1 2 BL 2 A LG 3 5 70 5mm 4 BL 1 B LG 1 ...

Page 5: ...Ø 4 mm 4 6 140 Ø 5 mm 4 5 70 5 34 BODEN II 40 4 ATTACH THE FIRST ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 4 LG 12 2 LG 2 2 LG 3 6 140 5 70 ...

Page 6: ...6 34 BODEN II 40 6 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK ...

Page 7: ...7 34 BODEN II 40 7 SLIDE THE DOOR IN ATTACH THE HANDLE CDD5R 3 LOGS IN PLACE ...

Page 8: ...8 34 BODEN II 40 17 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS 2 LG 2 A LG 1 2 LG 1 A LG 2 HITBLOCK ...

Page 9: ...9 34 BODEN II 40 SLIDE THE WINDOWS IN ATTACH THE HANDLE 18 CW1R CW1R ...

Page 10: ...10 34 BODEN II 40 32 B LG 3 17 LOGS IN PLACE B LG 2 1 LG 12 2 LG 5 3 LG 2 A LG 5 A LG 4 ...

Page 11: ... 4 6 140 Ø 5 mm 11 34 BODEN II 40 34 INSTALL THE CEILING BEAMS AND ATTACH THEM WITH SCREWS 3 LG 1 CB 1 LG 11 4 LG 11 2 LG 4 ...

Page 12: ...Ø 4 mm 11 5 70 12 34 BODEN II 40 35 INSTALL THE BEAM AND ATTACH WITH SCREWS BM 26CM ...

Page 13: ...Ø 3 mm Ø 20 mm 8 4 40 13 34 BODEN II 40 DRILL 20 MM HOLE IN THE MIDDLE OF THE POSTS BOTTOM ATTACH POST FOOT WITH SCREWS SCREW IN THE SECOND PART OF THE POSTFOOT 36 POST Ø 20 ...

Page 14: ...Ø 4 mm 4 5 70 14 34 BODEN II 40 ATTACH THE POSTS TO THE WALL WITH SCREWS MAKE SURE THAT THEY ARE STRAIGHT 37 ADJUSTABLE POST FOOT ...

Page 15: ...15 34 BODEN II 40 SCREW OUT THE SECOND PART OF THE POST FOOT SO THAT IT TIGHTLY TOUCHES THE GROUND DEPENDING ON THE SURFACE USE SCREWS OR ANCHOR BOLTS TO ATTACH THE POST FOOT TO THE GROUND 38 ...

Page 16: ... 4 6 140 Ø 5 mm 16 34 BODEN II 40 39 INSTALL THE GABLES WITH LONG SCREWS TO THE WALL LOGS ON THE FRONT AND REAR WALLS GABLE B TL 1 A TL 1 ...

Page 17: ... 6 6 160 Ø 5 mm 17 34 BODEN II 40 40 INSTALL THE ROOF PURLINS AND ATTACH THEM WITH SCREWS RFR RFB ...

Page 18: ... 276 4 50 18 34 BODEN II 40 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH 6 SCREWS 3 INTO EACH NEXT SAWTHE LAST BOARDTO MAKE IT FIT 41 RB ...

Page 19: ... 44 4 40 19 34 BODEN II 40 61 FOR THE FASCIA TRIMS INSERT SCREWS AFTER EVERY 0 5 METERS RR1 RR2 ...

Page 20: ... 32 4 40 Ø 3 mm 20 34 BODEN II 40 63 EAVES EDGES GO ON TOP OF THE ROOFING NOT INCLUDED RF EE ...

Page 21: ... 4 4 40 Ø 3 mm 21 34 BODEN II 40 64 ATTACH ROMBS WITH SCREWS ROMB ...

Page 22: ... 204 4 50 22 34 BODEN II 40 65 12 SCREWS INTO THE FIRST FLOORBOARD 6 INTO EACH NEXT SAW THE LAST BOARD TO MAKE IT FIT FB1 ...

Page 23: ... 130 4 50 23 34 BODEN II 40 72 10 SCREWS INTO THE FIRST FLOORBOARD 5 INTO EACH NEXT SAW THE LAST BOARD TO MAKE IT FIT FB2 ...

Page 24: ... 50 1 4 40 24 34 BODEN II 40 86 SAW THE BASEBOARDS AND ATTACH WITH NAILS AT EVERY 0 5 METERS BB ...

Page 25: ...4CM 20CM WINDBOARD 20 M8 70 Ø 8 mm 25 34 BODEN II 40 88 DRILL THROUGH THE WALL HOLE MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLT ...

Page 26: ...Ø 5 mm 36 6 140 26 34 BODEN II 40 ASSEMBLE THE STAIRCASE 90 ST1L ST2 ST1R ...

Page 27: ... 8 4 40 27 34 BODEN II 40 CUT THE BOARDS TO INSTALL THE STAIRCASE AGAINST THE WALL SET THE STAIRCASE AT THE RIGHT SPOT ATTACH THE FIRST HALF OF THE LADDER FITTINGS TO THE WALL WITH SCREWS 93 ...

Page 28: ... 8 4 40 28 34 BODEN II 40 CONNECT THE OTHER HALF OF THE LADDER FITTINGS AND ATTACH THEM WITH SCREWS TO THE STAIRCASE 94 ...

Page 29: ... 10 5 70 Ø 4 mm 29 34 BODEN II 40 CUT THE BOARDS TO INSTALL THE FENCE DETAILS AGAINST THE WALL ATTACH THEM WITH SCREWS 95 FN1 ...

Page 30: ... 16 4 40 Ø 3 mm 30 34 BODEN II 40 SAW THE FENCE DETAILS INTO THE RIGHT SIZE AND SHAPE ATTACH WITH SCREWS 96 FN2 FN2 ...

Page 31: ... 16 4 50 Ø 3 mm 31 34 BODEN II 40 SAW THE FENCE DETAILS INTO THE RIGHT SIZE AND SHAPE ATTACH WITH SCREWS 97 FN1 ...

Page 32: ...32 34 BODEN II 40 98 IF DOOR IS TILTED PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90º 90º 90º ...

Page 33: ...33 34 BODEN II 40 99 IF DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM ADJUST 3 SCREWS ON DOOR HINGES ...

Page 34: ...34 34 BODEN II 40 WHEN THE HOUSE IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100 ...

Reviews: