background image

× 

258

4

×

50

11/20

BRANTEVIK I 40

PLACE THE FIRST 

ROOFBOARD

 FLUSH WITH THE

END OF THE 

PURLINS

 AND ATTACH 

WITH 6 SCREWS,

 

3 INTO 

EACH

 NEXT, 

SAW THE LAST 

BOARD 

TO MAKE IT FIT.

46

RB

Summary of Contents for 4200003-1

Page 1: ...85 15 12 480 30 30 4 40 5 70 4 50 6 140 1 4 40 M8 70 3 mm 4 mm 5 mm 8 mm 1 20 BRANTEVIK I 40 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS...

Page 2: ...40 MAKE SURE THAT THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 3 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER IFB...

Page 3: ...0 BRANTEVIK I 40 LAY OUT THE BOTTOM LOGS ATTACH TO THE FOUNDATION THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS BY APPROXIMATELY 5MM THIS OVERHANG IS DESIGNED AS A RAIN DRIP 5 6 140 1 BL 1 1 BL 2...

Page 4: ...4 5 70 4 mm 6 6 140 5 mm 4 20 BRANTEVIK I 40 7 ATTACH THE FIRST ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 2 LG 6 1 LG 2 1 LG 5 6 140 5 70...

Page 5: ...5 20 BRANTEVIK I 40 12 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK...

Page 6: ...6 20 BRANTEVIK I 40 13 SLIDE THE DOOR IN ATTACH THE HANDLE CDD1R 3 LOGS IN PLACE...

Page 7: ...7 20 BRANTEVIK I 40 26 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS 1 LG 2 1 LG 1...

Page 8: ...8 20 BRANTEVIK I 40 SLIDE THE WINDOW IN ATTACH THE HANDLE 28 CW1R...

Page 9: ...0 5 mm 9 20 BRANTEVIK I 40 42 INSTALL THE GABLES WITH LONG SCREWS TO THE WALL LOGS ON THE FRONT AND REAR WALLS 14 LOGS IN PLACE GABLE B TL 1 A TL 1 B LG 4 B LG 3 B LG 2 A LG 2 A LG 3 A LG 4 14 LOGS IN...

Page 10: ...6 6 140 5 mm 10 20 BRANTEVIK I 40 43 INSTALL THE ROOF PURLINS AND ATTACH THEM WITH SCREWS RFR RFB RFB...

Page 11: ...258 4 50 11 20 BRANTEVIK I 40 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH 6 SCREWS 3 INTO EACH NEXT SAWTHE LAST BOARDTO MAKE IT FIT 46 RB...

Page 12: ...40 4 40 12 20 BRANTEVIK I 40 79 FOR THE FASCIA TRIMS INSERT SCREWS AFTER EVERY 0 5 METERS RR1 RR2...

Page 13: ...32 4 40 3 mm 13 20 BRANTEVIK I 40 83 EAVES EDGES GO ON TOP OF THE ROOFING NOT INCLUDED RF EE...

Page 14: ...4 4 40 3 mm 14 20 BRANTEVIK I 40 84 ATTACH ROMBS WITH SCREWS ROMB...

Page 15: ...204 4 50 15 20 BRANTEVIK I 40 89 14 SCREWS INTO THE FIRST FLOORBOARD 7 INTO EACH NEXT SAW THE LAST BOARD TO MAKE IT FIT FB...

Page 16: ...30 1 4 40 16 20 BRANTEVIK I 40 96 SAW THE BASEBOARDS AND ATTACH WITH NAILS AT EVERY 0 5 METERS BB...

Page 17: ...LL THROUGH THE WALL HOLE MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLTS 97 WINDBOARD CONNECTS BOTTOM LOG WITH THE TOP LOG SAW THE WINDBOARD INTO THE RIGHT LENGTH FOR THE TOP BOLT DRILL 8MM HOLE T...

Page 18: ...90 90 18 20 BRANTEVIK I 40 98 IF DOOR IS TILTED PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90...

Page 19: ...19 20 BRANTEVIK I 40 99 IF DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM ADJUST 3 SCREWS ON DOOR HINGES...

Page 20: ...20 20 BRANTEVIK I 40 WHEN THE HOUSE IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100...

Reviews: