background image

× 

6

× 

10

5

×

70

6

×

140

Ø 4 

mm

Ø 5 mm

3/20

CHRISTINA 28

LAY OUT THE 

BOTTOM

 LOGS, 

ATTACH

 TO THE FOUNDATION.

THE WALL 

LOGS

 WILL HANG OVER 

THE FOUNDATION 

BEAMS

 BY 

APPROXIMATELY

 5MM. THIS OVERHANG 

IS DESIGNED AS A RAIN DRIP.

  

5

%

2 BL-1

6

×

140

1 BL- 2

1 BL-1

A LG-3

B LG-3

5

×

70

5mm

Summary of Contents for CHRISTINA 28

Page 1: ...25 12 400 80 30 5 70 4 50 6 140 1 4X40 M8 60 3 mm 4 mm 5 mm 8 mm 1 20 CHRISTINA 28 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS...

Page 2: ...28 MAKE SURE THAT THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 3 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER IFB...

Page 3: ...20 CHRISTINA 28 LAY OUT THE BOTTOM LOGS ATTACH TO THE FOUNDATION THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS BY APPROXIMATELY 5MM THIS OVERHANG IS DESIGNED AS A RAIN DRIP 5 2 BL 1 6 140 1 BL 2 1...

Page 4: ...4 5 70 4 mm 6 6 140 5 mm 4 20 CHRISTINA 28 7 ATTACH THE FIRST ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 2 LG 1 1 LG 3 1 LG 2 6 140 5 70...

Page 5: ...5 20 CHRISTINA 28 12 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK...

Page 6: ...6 20 CHRISTINA 28 13 SLIDE THE DOOR IN ATTACH THE HANDLE BDD4 3 LOGS IN PLACE...

Page 7: ...7 20 CHRISTINA 28 26 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS...

Page 8: ...8 20 CHRISTINA 28 SLIDE THE WINDOW IN ATTACH THE HANDLE 28 BW2 1 LG 2 1 LG 1...

Page 9: ...6 6 140 5 mm 9 20 CHRISTINA 28 42 INSTALL THE GABLES WITH LONG SCREWS TO THE WALL LOGS ON THE FRONT AND REAR WALLS 18 LOGS IN PLACE 2 TL 1 A LG 1 B LG 2 B LG 1 A LG 2 1 TL 1...

Page 10: ...20 6 140 4 mm 10 20 CHRISTINA 28 43 INSTALL THE ROOF PURLINS AND ROOF ELEMENTS 1 ATTACH THEM WITH SCREWS RFB RE1...

Page 11: ...32 6 140 5 mm 11 20 CHRISTINA 28 SCREW RS1 AND RS2 TO PURLINS AND ROOF ELEMENTS 46 RS1 RS2...

Page 12: ...12 4 50 4 mm 12 20 CHRISTINA 28 USE SCREWS TO CONNECT ROOF SIDES 47...

Page 13: ...13 20 CHRISTINA 28 SAW ROOFBOARDS SO THAT IT IS POSSIBLE TO ATTACH THEM AGAINST ROOF SIDES AT THE BACK OF THE HOUSE WILL BE A GAP BETWEEN THE ROOFSIDE AND THE ROOFBOARD 79 RB...

Page 14: ...172 4 50 14 20 CHRISTINA 28 84 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH 8 SCREWS 4 INTO EACH NEXT RB...

Page 15: ...180 4 50 15 20 CHRISTINA 28 89 10 SCREWS INTO THE FIRST FLOORBOARD 5 INTO EACH NEXT SAW THE LAST BOARD TO MAKE IT FIT FB...

Page 16: ...30 1 4x40 16 20 CHRISTINA 28 96 SAW THE BASEBOARDS AND ATTACH WITH NAILS AT EVERY 0 5 METERS BB...

Page 17: ...12 M8 60 8 mm 17 20 CHRISTINA 28 97 DRILL THROUGH THE WALL HOLE MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLT 4CM 20CM WINDBOARD...

Page 18: ...90 90 18 20 CHRISTINA 28 98 IF DOOR IS TILTED PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90...

Page 19: ...19 20 CHRISTINA 28 99 IF DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM ADJUST 3 SCREWS ON DOOR HINGES...

Page 20: ...20 20 CHRISTINA 28 WHEN THE HOUSE IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100...

Reviews: