OPERATION
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at
48
HOB 260ABS
16.5
The dust collecting port
Planer:
The dust collector is under the entry planer
table.
Thicknesser:
After conversion to thickness planing, the dust
collector is folded upwards.
Do not operate the machine without a connected extraction system.
16.6
Conversion to planing
1.
Assembly dust collector
Loosen the clamp (3) and set the thicknessing
table (1) with the hand wheel (2) in the lowest
position.
Retighten the clamp (3).
Attach the adapter to the dust collector and fix it
by tightening the screw (4).
Pull out the brackets (5) on both sides of the
dust collector.
The dust collector is positioned so that the two
brackets (5) are in line with the longitudinal
boreholes (6).
Then press the brackets (5) into the longitudinal
boreholes (6) until you hear a clear clicking
sound.
NOTICE:
A safety switch is integrated in the
longitudinal hole at the front of the machine, which
guarantees that the machine can only be started
when the brackets of the dust collector are fully
engaged.