18
Now the rest of them can too
Ribs are aligned. in the They will
connect with the Glued spar.
After this Step, can also do the
Leading edge (CFRP tube 2.5mm)
be attached at the front.
To note now that the Comb for
aligning the Ribs shortened by
one field must become. Because
now it stands the root rib 5
degrees inclined and thus the
comb does not fit more over a
full half of the middle part
To fit the leading edge now, we put a comb just behind the leading edge and the other
just behind the spar. So the ribs can be at a 90 degree angle to the Spar to be aligned. We
weight down the ribs with weights so that they are completely in the To press base
plate.Now we start to press in the leading edge at the root rib A25. Rib by rib the leading
edge is now threaded towards the middle. Tip: approx. 15 ribs are threaded on,the
leading edge can be glued to the root rib. That makes things easier thread
Then the two of them can Pieces
of plywood A1V (for the Surface
screw connection) be put on.
These belong in the recess of the
Plywood ribs A1. The Top is
through that Deepening for the
Screw head marked.Then glue it
in place.The plug-in tube
Aluminum is back on a Side with
the plywood circle locked and
likewiseglued in