12
ADH-Series | Version 1.02
Installation and connection
1 Surface and thickness planer
2 Workpiece stop
3 Suction hose
4 Hose clamps (2 pieces)
5 Push stick
6 Support for workpiece stop
7 Connection of the suction unit
8 Suction adapter
9 Suction socket
10 Clamping lever (2 pieces)
11 Screw with washer
12 Clamp
13 Filter bag
14 Machine base frame
15 Front castor bracket
16 Connecting rod
17 Hindere Castor holder
18 Swivel castor (2 pieces)
19 Rigid roller (2 pieces)
Step 2: Mount the machine base with 12 hexagon socket
screws (A, Fig.7).
Fig. 7: Mounting the machine base frame
Step 3: Fit the 2 castor wheels (Fig.8) to the front castor
bracket using the cap screws and washers.
Step 4: Fit the 2 rigid castors (Fig.8) to the front castor
bracket using the screws and washers..
.
Fig. 8: Assembly of the transport rollers
Step 5: Mount the front and rear castor brackets to the
machine base (Fig.9).
Step 6: Bolt the front and rear castor brackets together
using the connecting rod (Fig.9).
Fig. 9: Mounting the Castor Bracket
Step 7: Adjust machine base (Fig.10) to the desired
height.
Fig. 10: Adjusting the machine feet
Step 8: Lift the surface and thickness planer onto the
machine base (Fig.11) with the help of a se-
cond person.
.
Fig. 11: Mounting the surface and thickness planer
Step 9: The surface and thickness planer with the help of
the screws and washers (B, Fig.12) on the ma-
chine base frame.
Swivel caster
Rigid caster
Connecting lever
Foot
Summary of Contents for ADH 2540 230V
Page 26: ...www holzstar de ...