This will ensure your system functions smoothly and prevent potential system damage.
Please check your system with the following list and confirm that each item has been completed.
closed
1.
2
2
2
8
2
2
2
2
2
2
2
2
8
2
1.
Gas Outlet Cap (G) is inserted properly and locking
clips are fastened
4.
Sandbags inserted in correct locations (page 21)
7.
Gas valve closed (until activation complete) & gas
valve on ground level
2.
Waste inlet & Combined outlet inserted completely
5.
Sink anchoring cords correctly attached
8.
Water Drainage Outlet valve closed
3.
Pipes in O, G & I assemblies inserted fully
6.
Steel bands on 20mm gas tube securely tightened
9.
All gas connectors screwed tight
Summary of Contents for HBG 2.0
Page 1: ...1 HB2 OM 050221 2021 HOMEBIOGAS VERSION 050221 HBG 2 0 HOUSEHOLD BIOGAS SYSTEM OWNER S MANUAL ...
Page 13: ...13 i ii iii x4 parts bag 1 i i ii iii LUBRICANT LUBRICANT ...
Page 15: ...15 1 parts bag LUBRICANT LUBRICANT ...
Page 16: ...16 x2 Inlet sink orientation short cord plunger slot towards back long cord towards front ...
Page 19: ...19 check filled digester for leaks contact HomeBiogas if any leaks are seen ...
Page 20: ...20 ii i LUBRICANT x2 ...
Page 21: ...21 i ii iii v iv 90 ...
Page 22: ...22 x40 i ii iii use dry sand only sand bags ...
Page 23: ...23 2 top x16 left right x16 back front x8 1 2 3 x2 x8 x8 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 ...
Page 24: ...24 iii ii GAS FILTER i remove 2 protective stickers from cover base of gas filter ...
Page 29: ...29 ...
Page 37: ...37 ...
Page 43: ...43 ...
Page 47: ...47 ...