6
system assembly
1. choose a suitable site
3. install gas pipes & drainage
4. activate system
5. wait for flammable gas
6. initial feeding period
(kitchen waste systems)
2. assemble the system
use system normally!
2 hours
1 hour
wait 1 day
1 - 3 weeks *
2 weeks *
From Assembly to Usage:
Equipment Needed
screwdriver (flat) OR
socket wrench 6/7/8
boiling water
water (1200 liters)
dry sand (50 liters)
Assembly with 2 persons
recommended
*5. you can continue feeding the system manure as per activation instructions (page 32). you may start trying to light the gas as soon as the gas tank has visibly started t
o fill
*6. for manure-only systems, there is no initial feeding period and you should continue feeding throughout the activation process (step 5.)
Summary of Contents for HBG 2.0
Page 1: ...1 HB2 OM 050221 2021 HOMEBIOGAS VERSION 050221 HBG 2 0 HOUSEHOLD BIOGAS SYSTEM OWNER S MANUAL ...
Page 13: ...13 i ii iii x4 parts bag 1 i i ii iii LUBRICANT LUBRICANT ...
Page 15: ...15 1 parts bag LUBRICANT LUBRICANT ...
Page 16: ...16 x2 Inlet sink orientation short cord plunger slot towards back long cord towards front ...
Page 19: ...19 check filled digester for leaks contact HomeBiogas if any leaks are seen ...
Page 20: ...20 ii i LUBRICANT x2 ...
Page 21: ...21 i ii iii v iv 90 ...
Page 22: ...22 x40 i ii iii use dry sand only sand bags ...
Page 23: ...23 2 top x16 left right x16 back front x8 1 2 3 x2 x8 x8 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 ...
Page 24: ...24 iii ii GAS FILTER i remove 2 protective stickers from cover base of gas filter ...
Page 29: ...29 ...
Page 37: ...37 ...
Page 43: ...43 ...
Page 47: ...47 ...