8
system should be installed close
to kitchen/cooking area
prepare at least 2.7 x 5.2m space
for the system
(0.5m side, 0.7m front clearance for
maintenance & daily usage)
prepare a firm, flat surface clear of
obstructions - do not place on soft
or unstable ground
e.g. flat dry ground, tile, concrete
do not place system on shipping
pallets or other weak raised
surfaces
place system within reach of a
water supply
2.5m
4.2m
0.5m
0.5m
0.5m
0.7m
Summary of Contents for HBG 4.0
Page 1: ...1 HB4 OM 150221 VERSION 150221 HBG 4 0 HOUSEHOLD BIOGAS SYSTEM OWNER S MANUAL 2021 HOMEBIOGAS...
Page 13: ...13 i i ii ii iii i iii x4 parts bag 1 LUBRICANT LUBRICANT...
Page 15: ...15 i LUBRICANT 1 parts bag LUBRICANT...
Page 16: ...16 Inlet sink orientation short cord plunger slot towards back long cord towards front x2...
Page 19: ...19 check filled digester for leaks contact HomeBiogas if any leaks are seen...
Page 20: ...20 ii i LUBRICANT x2...
Page 21: ...21 i ii iii v iv 90...
Page 22: ...22 x48 i ii iii use dry sand only sand bags...
Page 23: ...23 x5 x5 x5 x5 x3 x3 x3 x3 x3 x3 x3 x3 x1 x1 x1 x1...
Page 24: ...24 iii ii i GAS FILTER remove 2 protective stickers from cover base of gas filter...
Page 29: ...29...
Page 43: ...43...
Page 47: ...47...