4
PREPARATION
1. Turn Off Your Power
Begin installation by removing fuses or turning off circuit
breakers to the wiring you will be using. Use your compatible
UL listed outlet box if you already have one installed.
2. Choose Your Mounting Position
If you need to install a new UL listed outlet box, secure it
directly to your building's structure usingappropriate fasteners
and materials. Do not use plastic boxes. The outlet box and its
supports must be able to support the
MOVING
weight of the
fan (at least 50 lb.) and be rated for fan support.
3. Choose a Suitable Location
Ensure the blades will be at least 30 inches from any
obstruction and at least 7 feet above the floor. In
locations without a ceiling joist, a hanger support bar
may be required. Do not install in clamp locations.
Failure to disconnect the power supply prior to
installation may result in serious injury or death.
Use only on flat ceilings
Do not use on slanted surfaces
7
feet
30
inches