Upon arrival your kit should
look like this. Set the kit
as close as possible to the
assembly location.
Step 1
Lay all the pieces in the yard
around the assembly area.
Step 2
Set floor on leveled site. If
needed, level site with 2” of
stone or gravel.
Note: It is also possible to level
the floor using bricks, blocks or
other non-decaying material.
Need help? call 717-768-0804 page 1
Step 3
Set second (smaller) floor sec-
tion on level site. Once in
place, unscrew floor boards
and stack to side of floor.
© HomePlace Structures