Step 18
Repeat above steps for the
additional roof sections.
Step 19
Fasten the previously removed
1x10 planks with 2” nails. Nail
through 1x10 roof planks down
into both gables and rafters.
Note: Be sure nails don’t pro-
trude through gable overhang-
should use 1” to 1 1/4’ nails or
staples.
Step 20
Install the sofit board on both
front and back of playhouse,
keeping flush with front of the
rafters.
Step 21
Install face-boards between
gables on both front and back
of playhouse. Keep bottom of
face-board flush with the bot-
tom of the gable face board.