CAM PULLEY/CRANKSHAFT/PISTON/ CYLINDER BLOCK
HRR216PKA
9-6
THRUST WASHER INSTALLATION
1. Install the timing belt on the timing belt pulley.
2. Install the thrust washer; note the installation direction.
CYLINDER BLOCK/OIL PAN ASSEMBLY
1. Align the mark on the cylinder block with the mark on the
crankshaft.
2. Install the cam pulley (
3. Clean the mating surfaces of the cylinder block and the oil
pan using a degreasing cleaning agent or a clean shop
towel.
4. Install the two 8 x 20 mm dowel pins in the cylinder block.
5. Apply a bead 1.5 - 2.0 mm (0.06 - 0.08 in) of liquid gasket
(Hondabond HT or Loctite 5900) to the cylinder block.
6. Install the oil pan on the cylinder block.
Assemble within 10 minutes after applying the liquid
gasket.
If it is hard to install the oil pan securely, assemble by
turning the crankshaft a little.
7. Loosely tighten each 6 x 25 mm flange bolt, and then
tighten to the specified torque in the numbered sequence.
TORQUE:
12 N•m (9 ft-lb)
8. Wait for approximately 20 minutes after assembly before
filling it with oil and starting the engine.
THRUST WASHER
TIMING BELT
CRANKSHAFT
MARK
MARK
CYLINDER
BLOCK
LIQUID GASKET
APPLICATION
AREA
CYLINDER
BLOCK
8 x 20 mm
DOWEL PIN
8 x 20 mm
DOWEL PIN
Summary of Contents for HRR216PKA
Page 5: ...iv HRR216PKA NOTES...
Page 9: ...SPECIFICATIONS HRR216PKA 1 4 NOTES...
Page 45: ...MUFFLER HRR216PKA 5 2 NOTES...
Page 49: ...RECOIL STARTER HRR216PKA 6 4 NOTES...