BF135A•BF150A
5-123
7) Install the pump harness assembly on the pump cover, and
secure the pump harness assembly with the 4 mm screw.
TORQUE: 2.1 N
•
m (0.21 kgf
•
m, 1.5 lbf
•
ft)
8) Set the terminal holder on the pump cover and route each
wire as shown.
• Align the bosses on the terminal holder with the holes in
the pump cover.
9) Set the terminals in the positions shown.
10) Apply a thin coat of engine oil to the new O-ring and install
them on the oil case.
11) Set the seal ring at the discharge port of the pump.
12) Apply a thin coat of the engine oil to the new O-ring and set
it at the discharge port of the pump.
13) Connect the pump harness assembly terminals to the pump
terminals as shown.
• Connect the Blue/Yellow wire terminal to the positive (+)
terminal of the pump and the Black wire terminal to the
negative (–) terminal of the pump.
[4]
BLUE/
YELLOW
WIRE
[3]
PUMP COVER
[3]
BLACK
WIRE
[2] 4 mm WASHER
[4]
PUMP HARNESS
ASSEMBLY
[1] 4 mm SCREW
[2] TERMINALS
[4]
SEAL RING
[1]
BLACK WIRE
TERMINAL
[1] TERMINAL HOLDER
[3]
POSITIVE (+)
TERMINAL
[2]
BLUE/
YELLOW
WIRE
TERMINAL
[5]
O-RINGS
Do not reuse.