14-2
1. PROPELLER
a. REMOVAL/INSTALLATION
[3]
3 mm SPLIT PIN
INSTALLATION:
• Replace with a new one on
assembly.
• Be sure to use the genuine
part (stainless steel) and
bend the pin ends as shown
to stake the nut.
[1]
18 mm CASTLE NUT
INSTALLATION:
TORQUE:
1 N.m (0.1 kgf.m, 0.7 lbf.ft)
If the split pin cannot be set by tightening to
the specified torque, tighten the castle nut
additionally until the split pin can be set.
MAX. TORQUE:
44 N.m (4.5 kgf.m, 33 lbf.ft)
[2]
3-BLADE PROPELLER
[4]
PROPELLER WASHER
[5]
PROPELLER THRUST WASHER
INSTALLATION:
Install the propeller thrust washer as
shown.
[3]-1
3 mm SPLIT PIN
[5]-2
PROPELLER
SIDE
[5]-1
GEAR CASE
SIDE