Appendix
BC-200 Manual
– P/N DOC-01-013
122
9.6.5.2
NCM S
WITCHES
& T
ERMINATIONS
Ground Fault
detection switches
and Network End Of
Line Termination
Resistor switches
Channel A & B
connections
Network connection
ports (NUP)
Diagnostic LEDs
Not used
B
A
A
B
From last node,
Port A
To next node,
Port B
CONNECTION
DETAIL
Note:
Wiring from the NCM-W that is installed outside buildings:
- Must be in conduit and be buried in a trench separate from any power lines
- Cannot cross any power lines
NCM-W Connections:
Connector Pin
Signal Name
TB100-1
CH-A (+)
Channel-A Driver / Receiver
TB100-2
CH-A (-)
Channel-A Driver / Receiver
TB100-3
CH-B (+)
Channel-B Driver / Receiver
TB100-4
CH-B (-)
Channel-B Driver / Receiver
TB100-5
Earth Ground
Summary of Contents for BC-200
Page 1: ...BC 200 OPERATION INSTALLATION PROGRAMMING MANUAL P N DOC 01 013 ECN11 0058 23 Aug 12 Rev 5 07 ...
Page 138: ...Appendix BC 200 Manual P N DOC 01 013 138 9 12 PANEL EXPANSION RELAYS ...
Page 142: ...Appendix BC 200 Manual P N DOC 01 013 142 9 9 1 13 3 4 4 R RE EL LA AY Y M MO OD DU UL LE E ...
Page 144: ...Appendix BC 200 Manual P N DOC 01 013 144 9 9 1 13 3 6 6 Z ZO ON NE E M MO OD DU UL LE E ...
Page 155: ......