Preface
Part No.: 4417593_Rev09
Ensite Pro to CIU 888 Migration Manual
CIU 888
i
$*6
PREFACE
General
Commissioning is the first step following the installation of the CIU 888.
During commissioning, the CIU 888 site configuration is created and
site elements such as gauges, tanks and the CIU 888 are configured.
When the site is in operation and there are changes, for example a
gauge is added or an additional host system is connected, these
changes need to be implemented, and the CIU 888 needs to be
updated with the new site configuration.
Purpose of this manual
The purpose of this manual is to provide information about the
commissioning and configuration of the CIU 888.
Target audience of this manual
This manual is primarily intended for service technicians who are
responsible for commissioning and configuration of the CIU 888, and for
the migration of an existing CIU 880 Prime/Plus site configuration to the
CIU 888.