W-NXS AND CP-NXS
74-4059—01
8
In cases where there is less than 22.1" available width, you can alternatively mount all three modules above the NXS,
as shown in
Figure 6
Two DIN-rail mounting method B (alternate), all modules located above NXS.
There are two mounting methods for the NXS:
and
DIN Rail Mounting
DIN rail mounting is the preferred method. The following procedure provides step-by-step instructions for mounting
the NXS on DIN rail.
Procedure 1
To mount on DIN rail.
Step 1
Position the NXS on the DIN rail, tilting to hook clamps over the top edge of the rail (
).
Step 2
Swing the device down fully onto the DIN rail, until both clamps completely latch.
Step 3
Mount other modules (Power Supply, NXS-UPS, Battery) onto DIN rail in the same fashion—see the
installation document shipped with each module for complete details.
Step 4
If needed, secure devices with DIN rail
end-clips
provided by the DIN rail vendor.
NXS
NXS-PWR
SITOP UPS
Battery
Width minimum 18.3" (463 mm):
NXS plus mins.
Height minimum 20.0" (508 mm)
all
devices both DIN rails-- 100 mm clearance
all sides of NXS, 50 mm clearance
minimum top of UPS
1.97" (50 mm)
min.
3.86"
(98 mm)
3.94"
(100 mm)
min.
3.94"
(100 mm)
min.
5.24"
(133 mm)
4.92"
(125 mm)
3.94"
(100 mm)
min.
10.35" (263 mm)
3.86"
(98 mm)
2.0"
(51 mm)
3.94" (100 mm)
minimum, or
more if possible