NFS Supra
Page 39
HLS-MN-025 v.04
Installation and Operating Manual
www.honeywelllifesafety.es
www.hoeywelllifesafety.es
5.4.3 Delay 2 (Secondary delay
– Alarm inspection)
Delay 2
: Period of time available to check the alarm cause after pressing MUTE BUZZER push-
button. After this time, sounders will activate. It is possible to configure a period of time from 0
sec. (only delay 1 is performed) to 10 minutes at 1 minute intervals.
Delay 2 configuration:
Select Delay 2 by pressing
DELAY ON/OFF
=ON
Then press
RESET
push-button to change cyclically the led that has to be on and, consequently
to change the period of time.
No leds on
= OFF=
0s
only delay 1 (by default)
Led 1 Alarm (Red)
= ON =
1 min
Led 2 Disablement (Yellow)
= ON =
2 min
Led 3 Test (Yellow)
= ON =
3 min
Led 4 Power (Green)
= ON =
4 min
Led 5 General Fault (Yellow)
= ON =
5 min
Led 6 Earth fault (Yellow)
= ON =
6 min
Led Sounders fault/Disabled (Yellow) = ON =
7 min
Led 8 Power Supply (Yellow)
= ON =
8 min
Led 9 Auxiliary P.Supply F.(Yellow)
= ON =
9 min
Led 10 System Fault (Yellow)
= ON =
10 min
Reset push-button:
Change Option
(Access level 3 - Configuration)
increase
1 min
At level 1 or 2,
DELAY ON/OFF
push-button can be pressed in order to cancel
operating delays
Alarm inspection (delay 2) starts after pressing the mute key confirmation period (Delay 1).
The sounder and relay cards outputs operation depends on the control matrix.
Configuración
Maximum Delay
, Delay 1 + Delay 2, is 10 minutes
(EN54-2).
If there is any delay configured, the
disablement led
will be
illuminated.
The delay can be cancelled or disabled the Delay ON/OFF Led
is iluminated