Installation and Commissioning

Instructions

Note: HP2000 required for commissioning

HC5 or HC6 required for testing

MLS Digital Luminaire Controllers

MLS2000DIS & MLS2000DIW for DSI ballasts 

MLS2000DALIS & MLS2000DALIW for DALI ballasts

Summary of Contents for Ex-Or MLS

Page 1: ...d Commissioning Instructions Note HP2000 required for commissioning HC5 or HC6 required for testing MLS Digital Luminaire Controllers MLS2000DIS MLS2000DIW for DSI ballasts MLS2000DALIS MLS2000DALIW for DALI ballasts ...

Page 2: ...mps please ensure that the detector is at the cold end of the lamps In order to achieve satisfactory light level regulating operation a detector must observe a substantially greater proportion of artificial light from the luminaire s under its control than from neighbouring luminaires not under its control This is particularly important when planning the installed layout of linear luminaires that ...

Page 3: ...the OK button toggles between them ii Where there are multiple options a double click of the OK button recalls a list of all options for that parameter Use the UP DOWN and OK buttons to select iii Use the OK button to go forward through the menus without displaying help pages iv Press UPLOAD at any time to transfer all current settings from the handset to the product Please refer to HP2000 instruc...

Page 4: ...rs 4 This equipment should be used to control only those ballasts powered from the same phase as the detector 5 Do not connect mains to the MLS bus 2 6 It is imperative that the MLS bus is wired with the correct type of cable normally it should be 1 5mm unscreened twisted pair Please readApplication NoteAN4001 for more details 7 Due to the fact that the photocell is on the ceiling looking down it ...