Scenario
Output channel re-initialization description
PGM network is down
•
If the
Connection Break Timeout applicable for
Network Down
check box is selected, the output channels
initialize back from the user-defined values after the
connection break timeout timer is exceeded.
•
If the
Connection Break Timeout applicable for
Network Down
check box is not selected, the output
channels initialize back from the user-defined values
immediately.
Attention
The
Connection Break Timeout applicable for
Network Down
check box is added on the
Main
tab of
the DSB configuration form. This check box is available
from Experion R410.2 and later.
Values that can be configured as user-defined values
Attention
When configuring the initialization values for each channel, you must ensure that the
failsafe mode
parameter value
and the
Init Value
parameter value match with each other.
For example, if you have set the
failsafe mode
parameter as
max value
, then you must define the initial value for that
specific channel (100 for AO channel and 1 for DO channel).
The following figure displays a portion of the
Parameters
page of a device and
IOM Configuration/PDC
page of a
DSB.
The following table summarizes the various user-defined values that you can define for the output channels to
re-initialize after recovering from the communication break scenarios.
7 DEVICE SUPPORT BLOCK (DSB)
153
Summary of Contents for Experion PKS
Page 1: ...Experion PKS PROFIBUS Gateway Module User s Guide EPDOC XX88 en 431E June 2018 Release 431 ...
Page 8: ...CONTENTS 8 www honeywell com ...
Page 10: ...1 ABOUT THIS GUIDE 10 www honeywell com ...
Page 32: ...4 PROFIBUS GATEWAY MODULE PGM INSTALLATION 32 www honeywell com ...
Page 58: ...5 PROFIBUS GATEWAY MODULE PGM BLOCK 58 www honeywell com ...
Page 69: ...6 PROTOCOL BLOCK 69 ...
Page 103: ...5 Click OK 6 PROTOCOL BLOCK 103 ...
Page 110: ...6 PROTOCOL BLOCK 110 www honeywell com ...
Page 183: ...PDC Details tab Figure 6 Detail Display of PDC Details tab 7 DEVICE SUPPORT BLOCK DSB 183 ...
Page 186: ...7 DEVICE SUPPORT BLOCK DSB 186 www honeywell com ...
Page 231: ...9 PROFIBUS I O MODULE PIOMB FUNCTION BLOCK 231 ...
Page 232: ...9 PROFIBUS I O MODULE PIOMB FUNCTION BLOCK 232 www honeywell com ...
Page 236: ...10 PROFIBUS GATEWAY MODULE PGM CONFIGURATION EXAMPLE 236 www honeywell com ...
Page 264: ...13 PROFIBUS GATEWAY MODULE PGM TROUBLESHOOTING 264 www honeywell com ...