12.5 Replacing a redundant or secondary PGM IOTA board
Perform the following steps to replace a redundant or secondary PGM IOTA board
1
Select the
Redundancy
tab either from the primary or secondary PGM FB.
2
Click
Disable Synchronization
to set the Auto-Synchronization State parameter to "DISABLED."
3
On the defective IOTA, loosen screws at each side of the module cover that secures the PGM to the IOTA
board.
4
Loosen the plastic screw on the front of the module cover.Be careful not to strip the plastic screw head.
5
Carefully remove the PGM from the IOTA board and connector.
6
Label and disconnect all cables from the IOTA board connectors, (yellow and green FTE cables, and
PBLink cables).
Do not fully tighten the IOTA mounting screws before installing and tightening the power and ground
screws (24V and COM terminals) which can bind during installation or removal. Follow instructions
carefully.
7
Loosen the four mounting screws only half-way that secure the IOTA board to the channel.
8
Remove the screw from the left side of the IOTA board that connects to the 24 Vdc bus bar.
9
Remove the screw from the right side of the IOTA board that connects to the COM bus bar.
10
Remove completely the four mounting screws securing the IOTA board to the channel and remove the
IOTA.
11
Place screws, washers and spacers aside for reassembly.
12
Assemble screws, washers and spacers on the new IOTA board.
13
Mount the new PGM IOTA board on the channel at the same position as the old IOTA board.
14
Insert and thread the four mounting screws only half-way to attach the IOTA board to the channel.
15
Insert and tighten the screw to the left side of the IOTA board that connects to the 24 Vdc bus bar.
16
Insert and tighten the screw to the right side of the IOTA board that connects to the COM bus bar.
17
Tighten the four mounting screws securing the IOTA board to the channel.
18
Set the Device Index address to the same address as the old IOTA using the three rotary
FTE DEVICE
INDEX
switches.
19
Connect FTE-A and FTE-B Ethernet link cables to the RJ-45 connectors on PGM IOTA board.
• The yellow Cat5 cable must connect to the
FTEA
connector on the IOTA.
• The green Cat5 cable connects to the
FTEB
connector on the IOTA.
20
21
Connect the PBLINK cables to IOTA board.
22
Insert the PGM onto IOTA board making sure that the PGM circuit board mates properly with the IOTA
board connector.
23
Secure the PGM to the IOTA board with two screws located at each side of the plastic cover.
24
Using a #2 Phillips screwdriver, tighten the plastic screw on the front of the module cover. Be careful not to
strip the plastic screw head.
The PGM boots up into an unsynchronized secondary redundancy state with BKUP operating state.
25
Click the
Redundancy
tab from either the primary or secondary PGM FB.
26
Click
Enable Synchronization
to initiate synchronization and allow auto-synchronization.
12 PROFIBUS GATEWAY MODULE (PGM) MAINTENANCE
248
www.honeywell.com
Summary of Contents for Experion PKS
Page 1: ...Experion PKS PROFIBUS Gateway Module User s Guide EPDOC XX88 en 431E June 2018 Release 431 ...
Page 8: ...CONTENTS 8 www honeywell com ...
Page 10: ...1 ABOUT THIS GUIDE 10 www honeywell com ...
Page 32: ...4 PROFIBUS GATEWAY MODULE PGM INSTALLATION 32 www honeywell com ...
Page 58: ...5 PROFIBUS GATEWAY MODULE PGM BLOCK 58 www honeywell com ...
Page 69: ...6 PROTOCOL BLOCK 69 ...
Page 103: ...5 Click OK 6 PROTOCOL BLOCK 103 ...
Page 110: ...6 PROTOCOL BLOCK 110 www honeywell com ...
Page 183: ...PDC Details tab Figure 6 Detail Display of PDC Details tab 7 DEVICE SUPPORT BLOCK DSB 183 ...
Page 186: ...7 DEVICE SUPPORT BLOCK DSB 186 www honeywell com ...
Page 231: ...9 PROFIBUS I O MODULE PIOMB FUNCTION BLOCK 231 ...
Page 232: ...9 PROFIBUS I O MODULE PIOMB FUNCTION BLOCK 232 www honeywell com ...
Page 236: ...10 PROFIBUS GATEWAY MODULE PGM CONFIGURATION EXAMPLE 236 www honeywell com ...
Page 264: ...13 PROFIBUS GATEWAY MODULE PGM TROUBLESHOOTING 264 www honeywell com ...