4.4 Installing a PGM
Prerequisites
Before you install the PGM you should have:
• A control cabinet installed with appropriate channel hardware for mounting the Series C control hardware.
• A Series C power supply hardware installed in the cabinet.
• Installed pair of Control Firewall (CF9) assemblies.
• The PGM assembly (PGM module with IOTA board and mounting hardware). In addition, you need the
necessary parts for installing PGM to the control system. See Series C System Cabling in the
Control
Hardware Planning Guide
for cable hardware details.
• Ensure the cabinet enclosure is connected to a protective earth ground using #8 AWG solid copper wire.
There should be metal to metal contact between the grounding bus bar and the enclosure as well as the
channel.
Perform the following steps to install a PGM
1
Refer to appropriate site location drawings for the specified installation location, PGM Device Index (FTE
address), and wiring diagrams.
2
Identify the mounting location on channel and align mounting holes in IOTA with screw hole locations on
the channel.
3
Assemble mounting screws, washers and spacers provided. Insert spacers and washers between backside of
IOTA and front of channel.
Ensure that the component side of the IOTA is facing up.
CAUTION
Do not fully tighten the IOTA mounting screws before installing and tightening the power and ground screws
(24V and COM terminals) which can bind during installation or removal. Follow instructions carefully.
4
Position the assembled IOTA board at the proper mounting location.
5
Thread the four mounting screws only half-way to attach the IOTA board to the channel.
6
Tighten the mounting screws securing the IOTA board to the channel.
7
Connect FTE-A and FTE-B Ethernet link cables to the RJ-45 connectors on PGM IOTA board.
• The yellow Cat5 cable must connect to the
FTEA
connector on the IOTA.
• The green Cat5 cable must connect to the
FTEB
connector on the IOTA.
8
9
Route the FTE cables to the appropriate Control Firewall module location.
• The Yellow FTE cable is routed to the Control Firewall that supports FTE-A.
• The Green FTE cable is routed to the Control Firewall that supports FTE-B.
10
Connect
PBLink1
and
PBLink2
cables to the IOTA board.
11
Set the Device Index (
FTE DEVICE INDEX
) of the PGM according to the site documentation by turning
the three rotary decimal switches located on the IOTA board. Set the switches to the three digit address
ranging from 001 to 509. The left-most switch (100) is used to set the hundreds digit. The middle switch
(10) is used to set the tens digit and the right-most switch (1) sets the ones digit.
4 PROFIBUS GATEWAY MODULE (PGM) INSTALLATION
26
www.honeywell.com
Summary of Contents for Experion PKS
Page 1: ...Experion PKS PROFIBUS Gateway Module User s Guide EPDOC XX88 en 431E June 2018 Release 431 ...
Page 8: ...CONTENTS 8 www honeywell com ...
Page 10: ...1 ABOUT THIS GUIDE 10 www honeywell com ...
Page 32: ...4 PROFIBUS GATEWAY MODULE PGM INSTALLATION 32 www honeywell com ...
Page 58: ...5 PROFIBUS GATEWAY MODULE PGM BLOCK 58 www honeywell com ...
Page 69: ...6 PROTOCOL BLOCK 69 ...
Page 103: ...5 Click OK 6 PROTOCOL BLOCK 103 ...
Page 110: ...6 PROTOCOL BLOCK 110 www honeywell com ...
Page 183: ...PDC Details tab Figure 6 Detail Display of PDC Details tab 7 DEVICE SUPPORT BLOCK DSB 183 ...
Page 186: ...7 DEVICE SUPPORT BLOCK DSB 186 www honeywell com ...
Page 231: ...9 PROFIBUS I O MODULE PIOMB FUNCTION BLOCK 231 ...
Page 232: ...9 PROFIBUS I O MODULE PIOMB FUNCTION BLOCK 232 www honeywell com ...
Page 236: ...10 PROFIBUS GATEWAY MODULE PGM CONFIGURATION EXAMPLE 236 www honeywell com ...
Page 264: ...13 PROFIBUS GATEWAY MODULE PGM TROUBLESHOOTING 264 www honeywell com ...