43-TV-33-56 iss.4 GLO Aug 19 UK
15
4. Connect all the cables as per the information in the above table and by using Figure 26.
5. Replace the slanted chassis plate and fit it back along with the earth braid using 2x No.4/40 screws as shown in
Figure 27.
Figure 26
Cables reconnected
inside the slant
chassis plate
Figure 27
Reconnecting slant
chassis