A standard RJ-45 modular jack is available on the FDAP Gen3 Power and IO board. The RJ-45 jack may be
used to test cable integrity after terminating the cable at the IDC connector. After terminating the field cable at
the IDC, connect the cable tester to the RJ-45 jack. An end-to-end cable test can then be performed to ensure
proper wiring at the IDC connector.
3.12
Connect power cables and Ethernet cables for
FDAP1/FDAP2
FDAP1/FDAP2
has one Ethernet cable and one power cable. Ethernet interconnection is limited to
installations outside Class I Division 1, Zone 0/1 locations. You have to construct conduit and cable
runs for power and Ethernet. The
FDAP1/FDAP2
can be powered directly by universal AC power
supply or by external DC power supply such as distributed DC source. Ensure that all wires inside
the enclosure are routed and secured properly as displayed in “Figure 7: Ethernet and field DC
power” and “Figure 8: Ethernet and field AC power”. The
FDAP1/FDAP2
has integrated terminal
blocks that allow field wiring to be directly terminated inside the
FDAP1/FDAP2
without an
additional external junction box. Power (both AC and DC) connection, Ethernet and Serial
connections can be terminated inside the
FDAP1/FDAP2
.
3.12.1
DC power wiring
When powered from an external DC source, the power cable should be terminated directly onto the
terminal block of the DC Ferrite Assembly. Connected wires then pass through the mounted ferrites
on the assembly board, which then connects to the two-position terminal block on the Power
Board. The polarity of the connector is marked next to the connector on the Power Board. The
power cable should be shielded and the drain wire grounded inside the enclosure as displayed in
“Figure 7: Ethernet and field DC power”.
Secure all connections and wires and connect the
cover-ground connection
lug to the enclosure
cover to complete the wiring.
Summary of Contents for FDAP3P
Page 27: ...25 3 FDAP INSTALLATION Ensure all your grounding connections terminate here ...
Page 55: ...45 6 The Confirm Field Expandable Wireless IO Change dialog appears 7 Click OK ...
Page 70: ...4 FDAP CONFIGURATION 60 www honeywell com ...
Page 89: ...79 6 FDAP MAINTENANCE AND TROUBLESHOOTING 8 2 FDAP Dimension Drawing ...