MU1H-1142GE23 R0608
6
Honeywell GmbH
GB
8. Maintenance
8.1 Inspection
8.2 Maintenance
8.2.1 Filter bowl
1. Close shutoff valve on inlet and outlet.
2. Release pressure on outlet side
3. Unscrew filter bowl
4. Remove filter cartridge
5. Insert filter cartridge in new filter bowl
6. Screw filter bowl in place
7. Open shut-off valve on inlet
8. Slowly open shutoff valve on outlet
8.2.2 Filter insert
1. Close shutoff valve on inlet and outlet.
2. Release pressure on outlet side
3. Unscrew filter bowl
4. Remove filter cartridge
5. Insert new filter cartridge in filter bowl
6. Screw filter bowl in place
7. Open shut-off valve on inlet
8. Slowly open shutoff valve on outlet
9. Disposal
• Head and ring nut: reinforced polypropylene
• Polypropylene fine filter
• Clear synthetic material filter bowl
• ETP O-Ring
Regular inspection of filter insert - approx. every
4 month.
o Replace if contamonation is high!
Replace filter insert at least every 6 month.
10. Troubleshooting
11. Spare Parts
12. Accessories
Problem
Cause
Remedy
Too little or no water pressure
Shut-off valves up- or downstream are
not fully open
Open the shutoff valves fully
Filter cartridge is contaminated
Replace filter cartridge
Filter is not fitted in flow direction
Fit filter in flow direction
1
Replacement filter cart-
ridge 25µm
Cartridge
Height 10"
FF20-DMF
2
Replacement active
carbon cartridge
Cartridge
Height 10"
FF20-GAC
FF20
FF40
1
2
1
RV277 Inlet check valve
Applicable sizes R
3
/
4
" - 1"
RV284 Check valve
Applicable sizes R
3
/
4
" - 1"
VST06 Connection set
Connection set
A = Threaded male connection;
B = Solder union connection
RV277
VST06A
VST06B
RV284