![background image](http://html.mh-extra.com/html/honeywell/fsc-sm/fsc-sm_installation-manual_151409031.webp)
10/01
FSC Safety Manager Installation Guide
19
1.4
Unpacking and Placement,
Continued
Crane method
In this method the cabinet is lifted into place with a crane. Use either an
angle iron transport skid (see Figure 1-12) or the lifting eyebolts installed
on each cabinet (see Figure 1-13).
Figure 1-13 – Eyebolt crane method
One
bay
Two
bays
Three
bays
Four
bays
x x
x x
x
x
x
x
x
x
x
x
x
x
x
x
Leveling and
bolt-down
FSC Safety Manager cabinets do not include levelers; it may be necessary
to hand-fit shims underneath the cabinet in order to make the cabinet sit
solidly.
The FSC-SM cabinet has four holes in the bottom for bolting it to a floor.
A partially filled cabinet should be bolted down. Cabinets that are bolted
together are not easily moved and do not ordinarily require bolting down.
Refer to Figure 1-2 for bolt-down dimensions.
Summary of Contents for FSC-SM
Page 2: ... ...
Page 6: ...iv FSC Safety Manager Installation Guide 10 01 ...
Page 12: ...x FSC Safety Manager Installation Guide 10 01 ...
Page 32: ...20 FSC Safety Manager Installation Guide 10 01 Left blank intentionally ...
Page 54: ...42 FSC Safety Manager Installation Guide 10 01 Left blank intentionally ...
Page 70: ...58 FSC Safety Manager Installation Guide 10 01 Left blank intentionally ...
Page 74: ... ...
Page 75: ... ...