Introduction
Introduction
2
These installation and operating instructions contain all the information required for installation,
commissioning and configuring the underfloor heating controller HCE80(R) / HCC80(R).
All the operating elements and connections are shown on a fold-out page.
1
Fold out the left-hand cover.
Leave the cover folded out while reading further.
Legend for fold-out page
Fig. 1
Scope of delivery
Fig. 2
Opening the housing
Fig. 3
Display and operating elements
(1)
Power
Power supply on/off
(2)
Information display
(3)
Installation display
(4)
Mode
Operating mode button
(5)
Installation button
(6)
Pump off/off display
(7)
1...8
Zone LEDs
(8)
Labelling of Zones 1...8
Fig. 4
Connections
(9)
I/O
connector
(10)
Switch for setting normally
open/normally closed
(11)
Slot for expansion module HCS80
(12)
Connector for supply voltage, pump
(13)
Fuse
(14)
Slot for internal antenna
(Z1...Z8) Connector for Zones 1...8
Fig. 5
I/O connector
Fig. 6
Connector for Zones 1...8
Fig. 7
Connector for supply voltage, pump
Summary of Contents for HCC80
Page 1: ...HCE80 R HCC80 R Mounting and operation Montage en bedrijf Montage et fonctionnement ...
Page 2: ... ii English 1 Nederlands 30 Français 59 ...
Page 4: ... iv ...
Page 92: ......
Page 93: ......