Decommissioning, storage, renewed start-up, disposal
HON 512 with HON 650 pilot user manual
148
Proceed as follows:
Figure
Step
Description
1
▪
Stabilize the gas pressure regulator in its
installation position without using the
fittings to do so.
▪
Hook the slings into all the eye bolts
intended to function as attachment
points for transportation.
2
Remove all connection lines between the
pilot and the gas regulating line, as well as
the pilot’s vent line.
3
If there is one, disconnect the electrical
connection for the electrical displacement
transducer.
4
Unscrew the threaded joints (1) on the
connection flange. Make sure to follow a
criss-cross sequence when doing so.
5
Remove the device from the regulating line
and remove the flange gaskets (1).
6
Slowly and carefully transport the device.
Depending on what you want to do next, proceed as indicated in the relevant section:
▪
Maintenance
(see page 65)
▪
Storing the gas pressure regulator
(see page 149)
▪
Disposing of the gas pressure regulator
(see page 151)
Disassembling the device
Next task
Summary of Contents for HON 512
Page 185: ...Appendix HON 512 with HON 650 pilot user manual 185 X Fail to open version Y Amplifying valve ...
Page 205: ...Appendix HON 512 with HON 650 pilot user manual 205 ...
Page 206: ...Appendix HON 512 with HON 650 pilot user manual 206 ...
Page 207: ...Appendix HON 512 with HON 650 pilot user manual 207 ...