Decommissioning, storage, renewed start‐up, disposal
User manual for HON R100 gas pressure regulator with HON P095NG pilot
80
No.
Meaning
1
Inlet stop valve armature
2
Inlet pressure gauge
3
Gas pressure regulator
4
Loading pressure pressure gauge
5
Blowdown line shut‐off device
6
Outlet pressure gauge
7
Outlet stop valve armature
Make sure that the following requirements are met:
The device has been checked with regard to its maintenance condition as indicated in
the
Maintenance
(see page 44) chapter.
The system has been checked, is fully functional, and has no leaks.
The inlet and outlet shut‐off devices for the gas regulating line section are closed.
The shut‐off devices for the blowdown lines are closed.
The inlet pressure is present upstream of the inlet shut‐off device. Details about the
operating pressure can be found in the
technical specifications
(see page 17).
The system is depressurized between the inlet shut‐off device and the outlet shut‐off
device.
Proceed as follows:
Step
Description
1
Slowly
open the inlet shut‐off device to pressurize the inlet pressure area.
2
The outlet pressure will slowly increase. Once this pressure matches the pilot’s setpoint,
slowly open the outlet shut‐off device.
If problems occur when putting the device back into operation, please refer to the
Malfunc‐
tions
(see page 42) chapter for more information.
9.4
Disposing of the device
Comply with the legally stipulated disposal rules. Observe the following details pertaining to
the appropriate disposal (not all of the items may be applicable to your device):
Dispose of the metals according to their types and grades (steel scrap, cast iron scrap,
light alloy scrap, nonferrous heavy metal scrap, synthetic rubber scrap, electronic
scrap).
Recycle elements made of synthetic materials.
Dispose of any other components according to the quality of the materials.
Requirements
Adjusting the gas pres‐
sure regulator
Appropriate disposal