2
Table of Contents
Warnings and Cautions
3
A.
Signal Words
3
1.Overview 4
1.1
Tests and record keeping
4
1.2
PC Connection
4
1.2.1
USB Connection
4
1.2.2
Ethernet Connection and E-mail
4
1.3
PC Requirements
5
1.4
Instrument Firmware Requirements
5
1.5
Power Requirements
5
1.5.1
Dock with direct USB Connection to PC
5
1.5.2
Multi-Dock Setup with USB Connection
5
1.6
Sensor compatibility
5
1.7
Default Calibration Gas Settings
5
1.8
Calibration Gas Cylinder Regulator Requirements
5
1.9
Dock Location
5
1.10
Delivery 5
2.Installation 5
2.1
Installation Overview
6
2.2
IQ Administrator Pro and PostgreSQL Database Server Installation 6
2.3
IQ Database Manager Software Installation
6
2.4
MultiPro IQ Express PC Software Installation
6
2.5
Install IQ Administrator Pro and PostgreSQL database
8
2.6
Power and Connectivity
8
2.6.1
PC – Single Dock via USB
8
2.6.2
PC – Multi Dock via USB
8
2.7
Connecting the Calibration Gas Cylinder to the Dock(s)
9
2.7.1
Single Cylinder to Single Dock
9
2.7.2
Single Cylinder to Multiple Docks
9
2.7.3
Fresh Air Port Instructions
10
Fresh Air Filter
10
Providing Fresh Air in a Contaminated Environment
11
Option 1: Using a Gas Cylinder to Provide Fresh Air to the Dock
11
Option 2: Using a Sealed Conduit to Provide Fresh Air to the Dock
11
Multi-Dock Setups with Fresh Air Manifold
11
2.8
Initial PC- Dock Connection
12
2.8.1
PC screens
12
2.8.2
Dock screens
13
3.Software 13
3.1
Dock Status (USB Connection)
14
3.2
Dock Controls and Instrument Status
14
3.2.1
Dock Configuration
14
Hardware Configuration
15
Connection Speed
15
Audible Alarm Sensitivity Controls
15
AC Power
15
Pump Diagnostics
15