GB
Installation
6
MU1H-1555GE23 R0815
5. Installation
For the installation no special tools are required.
Standard heat and sanitary installer's tools are
sufficient.
5.1 Torque specification
Fig. 5: Torque specification
Tab. 6: Torque specification for fasteners
5.2 Checking scope of delivery
Tab. 7: Scope of delivery
• Check delivery for completeness and integrity.
• Unpack all parts.
• Inform Honeywell Technical Team if parts of the
delivery are damaged or missing.
• Never install damaged parts.
5.3 Installation Guidelines
The installation site has to be frost-proof and the
protection of the device from chemicals, paints,
detergents, solvents and their vapors and
environmental influences must be guaranteed.
• Install if possible in horizontal or vertical pipe work
with filter housing downwards
- This position ensures optimum filter efficiency
• Ensure good access
- Simplifies maintenance and inspection
5.4 Installation
• Read these installation instructions completely
before beginning the installation.
• Make certain that the heating system is standing idle
properly (see manufacturer's instructions for the
heating system).
• Drain heating system and locate return pipe. Filter is
typically installed in the return pipe.
Mark the section to be cut out according to the
cutting ruler and remove the marked pipe section.
• Mark the length of the pipe section to be removed
using the cutting ruler on the edge of the packaging
sleeve at hand.
• Make sure there is adequate room to rotate the filter
and access it for cleaning purposes.
Number
Torque specification
1
Hand tight
2
Max. 1 Nm
3
Max. 18 Nm ±10 %
Designation
Count
MHF49
1
Installation instructions 1
Cutting ruler (included on
the packaging sleeve)
1
[1]
[2]
[3]
Carefully select the installation location of
the MHF49 so that the MHF49 is easily
accessible for cleaning and maintenance.
The cutting ruler you find on the packaging
sleeve.
• Mark the length of the pipe section to be
removed using the ruler on the edge of
the packaging sleeve at hand.