Installation
System Power
20
BACNET-GW-3 Installation and Operation Manual – P/N LS10014-000NF-E:C6 5/5/2017
2.4 System Power
2.5 Testing and Maintenance
Testing and maintenance should be performed according to the
Testing and Maintenance
section of
NFPA-72 and CAN/ULC S536.
Table 2.5 Power Requirements
Power
Requirement
Input Voltage (Nominal)
24 VDC
Input Current @ 24 VDC
125 mA