2.1.4 Glossary of Icons
Throughout this Installation and Commissioning Manual
and other supplied user documentation a number of
simple icons are used, either on their own or together
with larger illustrations, to simplify a particular task or
process.
The following icons are used to advise or indicate:
a) DO follow the recommended procedure or method
b) DO NOT use this procedure or method
c) Inspection of an item or sub-assembly is required at
this point
d) Following a defined process
meets
the required
approval/inspection criteria or standards
e) Following a defined process
does not meet
the
required approval/inspection criteria or standards
f) Additional items to be considered
g) This icon placed next to a pushbutton requires you to
press it as part of a described process, such as isolate
or test, or while programming the panel. Where two or
more icons are used, a number may be placed on or
near each hand to indicate the order of selection: 1
coming before 2, etc.
h) Activity process step - flow arrow for single action or
iterative actions
i) Leader arrow - used with activity processes
j) Sounder operating
k) Sounder not-operating or silenced
l) Digital clock timer - press and hold the applicable
pushbutton for the time indicated