NFN Gateway Installation Overview
NFN Gateway Embedded Installation
19
NFN Gateway Installation & Operation Manual - P/N: 52306:Rev: D 06/01/07
2.2.2 NFN Gateway PC Board Layout
Figure 2.2 NFN Gateway PC Board
Reset Button
The Reset button is used to cycle power to the PC board. It does not affect the settings made to the
software.
Lithium Battery
DB9-NUP Connector -
used for operation as
the network connection
to NFN Network
RJ45 Ethernet
Connector (CN2)
HDD Power
Connector (P1)
Reset Button
NOTE:
The replacement of the PC Board’s lithium battery is to be performed by a trained technician.