Installation
TP1MAN Issue 3 Apr 06 (MAN0630)
10
•
enough space to open the enclosure’s access panels, for cabling, maintenance,
adjustments, etc.
•
enough space for cable or conduit access to the bottom of the enclosure
Follow the advice of:
•
experts having specialist knowledge of gas detection and control systems
•
experts having knowledge of the process plant system and equipment involved
•
safety and engineering personnel
Always record the location of the detector that is connected to the controller.
Dimensions
90 mm
(3.5”)
Mounting
Hooks
395 mm
(15.6”)
130 mm
(5.1”)
Note
Diagram not to scale.
Enclosure