OPERATION AND CHECKOUT

Once both the mechanical and electrical installations are 
complete:

1.

Cycle the actuator to verify that the direction of rota-
tion suits the control sequence.

2.

If the rotation direction is incorrect:

a. For 2-position control actuators: Remount actu-

ator on the bracket.

b. For floating control actuators: Reverse two con-

trol signal wires (CW/CCW).

c. For analog control actuators either:

(1) Reposition reverse/direct acting switch, or

(2) Remount actuator on the bracket.

3.

If the control scheme requires fail-safe operation, 

ensure that, upon removal of power, the valve 

rotates to the desired position.

4.

Spring return actuators are factory-configured for 

A-port normally-closed fail-safe operation. To 

change this to normally-open, remove and reinstall 

the actuator in the opposite orientation as follows:

(a) Loosen the shaft coupling bolt using a 10 

mm wrench.

(b) Loosen all other mounting bolts connect-

ing the actuator to the mounting bracket, 

and set aside.

(c) Remove the actuator from the valve 

shaft.

(d) Move the actuator shaft coupling to the 

opposite side of the actuator, as displayed 
in Figure 7.

Fig. 7. SCSA Mounting

For detailed actuator information, see Honeywell forms:
— 63-2209 ML6161,ML7161 Product Data Sheet.

— 63-2607 S05,S10,S20 Series Actuator Product Data 

Sheet.

M29526

VALVE BODY 

VALVE STEM 

COUPLER

WING NUT

MOUNTING 

PLATE

ANTI-ROTATION 

BRACKET

BOLT

STEM ASSEMBLY COVER

SCREWS (2)

HANDLE (REMOVABLE) FOR 

MANUALLY ROTATING SHAFT

STEM ASSEMBLY

SCREWS (2)

STEM RETAINER PLATE

BOLT

ANTI-ROTATION 

BRACKET

1

2

 

INCLUDED IN REPLACEMENT KIT (PART NO. 5112-11).

THIS PART USED WITH NON-SPRING RETURN ACTUATORS.

1

2

1

1

1

1

1

1

1

1

1

M27714

Summary of Contents for VBN2

Page 1: ...tream of particles larger than 1 16 in diameter Open valves fully Flush entire hydronic system of contaminants welding slag solder scale metal chips etc and chemically treat water according to local conditions prior to operation 2 Proceed with installation once the system specifics expansion contraction of the system and its medium as well as operating pressures are within tolerances 3 Eliminate a...

Page 2: ...e mounting plate positions 6 Rotate mounting plate around valve top to the desired position IMPORTANT Do not rotate the valve stem while the hold down ring is removed This can change the common port from AB to A 7 Lower ring down to valve body and engage it in the new position relative to the mounting plate 8 Tighten screws to valve body securing the mounting plate 9 Reattach the stem assembly to ...

Page 3: ...port normally closed fail safe operation To change this to normally open remove and reinstall the actuator in the opposite orientation as follows a Loosen the shaft coupling bolt using a 10 mm wrench b Loosen all other mounting bolts connect ing the actuator to the mounting bracket and set aside c Remove the actuator from the valve shaft d Move the actuator shaft coupling to the opposite side of t...

Page 4: ...4 95 4 1 16 103 3 1 16 78 B 6 7 16 163 6 1 2 165 6 11 16 170 3 76 4 102 6 5 8 168 6 1 2 165 7 3 8 187 7 178 7 1 16 180 7 7 16 189 6 3 4 171 10 11 16 271 8 1 8 206 1 0 0 5 5112 19 5112 22 SS 5112 20 5112 23 SS 5112 21 5112 24 SS 8 5 16 211 8 11 16 221 8 1 8 206 8 5 16 211 8 7 8 225 9 1 16 230 8 7 8 225 10 1 2 267 8 11 16 221 1 4 0 6 2 4 1 1 2 4 1 1 3 2 1 5 1 4 0 6 C D E F LB KG A C F E D B M31360 I...

Reviews: