145
7
Inst
alling
the Delivery Con
veyor /
Inst
a
lla
tio
n
7-4
Installing the Delivery Conveyor
7-4-1 SC-200 Short Conveyor
1
Attach the hanger bolts only if the
delivery conveyor is connected to
the SPF main unit.
- This step is unnecessary for the fore-edge
trim section because the hanger bolts are
already attached.
1. Remove the front and rear covers.
2. Attach the hanger bolts.
3. Attach the removed covers.
2
Install the conveyor.
- To install the conveyor, insert the hanger
bolts into the holes.
3
Attach the supports.
- Use the screws already attached to the con-
veyor and main unit.
- The supports can be attached by just loosing
the screws.
4
Attach the stack plate.
5
Attach the delivery roller.
- Remove the screw on the end of the roller
bar and then attach the delivery roller.
6
Plug in the connector for the con-
veyor.
11119
70401A1
11119
70401B1
Nut
Hanger Bolt
11119
70401C1
11119
70401D1
11119
70401E1
11119
70401F1
Stack Plate
Support
Delivery Rollers
Roller Bar
Hanger
Bolt
11119
70401H1
11119
70401G1
Side of SPF
Main Unit
Back of Fore-edge
Trim Section
Connector
for Delivery
Conveyor
Summary of Contents for Bookletmaker FC-200A
Page 84: ...This page is intentionally left blank...
Page 94: ...This page is intentionally left blank...
Page 146: ...This page is intentionally left blank...
Page 202: ...This page is intentionally left blank...
Page 217: ...This page is intentionally left blank...
Page 218: ...Manufacturer Phone 81 75 934 6700 Fax 81 75 934 6708 www horizon co jp...