53
Doing a T
est Binding /
Operatin
g Pro
cedure
s
3
3-4
Doing a Test Binding
3-4-1 Preparing the Upstream Device
1
Turn on the power switch on the
upstream device.
- It does not matter which machine is turned
on first.
2
Set up the upstream devices.
- Refer to the user's manual for each device.
ST-40
1.Set up the guides to match the sheet size if
you want to use the faulty set ejecting func-
tion.
2.Turn on the Stitch function.
3. Attach the transport guide.
BC-20
1. Set the horizontal transport conveyor on the
BC-20 to the horizontal position.
2. Set up the faulty set ejecting function.
- When you turn on the faulty set ejecting
function, adjust the stopper on the reject tray
to match the sheet size.
HOF-400/HOF-30/HOF-20
1. Load the sheets.
2. Do a test feed.
Transport
Guide
11119
30401A1
Stitch
(Lamp On)
1 2 3
1 2 3
11119
30401B1
faulty set Ejecting
Function
(Lamp On)
11119
30401C1
21102
30401D1
LED
11119
30401E1
21102
30401F1
2 3 4
The Locking knob is located behind
the stopper.
Stopper
Test Feed Button
Summary of Contents for Bookletmaker FC-200A
Page 84: ...This page is intentionally left blank...
Page 94: ...This page is intentionally left blank...
Page 146: ...This page is intentionally left blank...
Page 202: ...This page is intentionally left blank...
Page 217: ...This page is intentionally left blank...
Page 218: ...Manufacturer Phone 81 75 934 6700 Fax 81 75 934 6708 www horizon co jp...